During Atheltic rubber track construction,how to avoid rain ?

 I believe that many constrution teams  meet this problem.Just after the construction of tartan track,it was drenched and even soaked by the sudden heavy rain.Apart from worrying, there was no remedy.



According to years of experience, there are two ways to deal with rubber track that are drenched by rainwater.

1. The rubber track cannot be completely cured after being exposed to rain. This kind of treatment is more troublesome. The incurable part must be completely shoveled off, and then thoroughly polished until the underground cement foundation is exposed, and then restart according to the process. Although it is a waste of materials and labor, this is the only more thorough solution without any sequelae.

2. The athletic running tartan track can be cured after being exposed to rain, but there are many small pits on the surface that are smashed by raindrops, and there may be bubbles in some places. To deal with this situation, first use a knife to cut off the bubbles and use PU material is divided into several times to fill up the bubbling, and then use an grinder machine to polish the small pits as far as possible, even if there is a slight unevenness after the grinding, it does not matter, and finally a thin layer of PU material is used to make up It can be flat.



Pay attention to rain prevention during construction

   There are certain conditions during the construction of the oval running track project. For example, the surface temperature during construction should be in the range of 15 to 45 centigrade, and the weather should be sunny, fog-free, and relatively humid. In order to ensure the quality of the entire rubber athletic track project, the construction personnel must follow these conditions during the construction process to prevent the project from failing to achieve the expected results. Here I would like to remind you that water cannot be added to the rubber track materials during the construction process.

During the construction of the athletic track, water and rain should be avoided as far as possible, because the athletic track is a kind of polyurethane rubber material. After laying the rubber surface , there will be blistering and shelling, because the density of the base course of the rubber track is not controlled reasonably. Therefore, it is necessary to strictly control the density of the rubber track, so as to prevent shelling and shelling because the asphalt foundation layer itself is not compacted, and the surface of the oval track is gasified, and even the foundation surface is broken in serious cases.

During the construction period, plastic film should be equipped to listen to the weather forecast at any time. In case of rain during the construction, stop work immediately to cover the plastic film on the the surface .

Comments

Popular posts from this blog

Synthetic Sports Flooring Used Instruction

  1.  Synthetic Sports flooring  only for teaching, training and competition, not for parking or others usage 2.  The flooring edge should be protected, not allow to move or pull. If damage, it should be repaired in time. 3.  Athletes can wear professional sports shoes during the competition, but the length of the spikes should not exceed 6mm. 4.  It is forbidden to wear high heels into the stadium. 5.  It is strictly forbidden to drive, park and stock goods. 6.  Avoid put the organic solvents in the synthetic flooring, including gasoline, oil, diesel and thinner. 7.  It is forbidden to use all chemicals, including athlete-treated drugs and adhesive items such as chewing gum. 8.  In general, the synthetic flooring should be kept clean. In high temperature, it is recommended to use water to cool down to improve the service life. 9.  When the synthetic sports flooring is oily, it can be cleaned with natural detergent, etc., avoid usin...

Plancher de sport synthétique utilisé Instruction

  1.  Sols sportifs synthétiques  uniquement pour l'enseignement, l'entraînement et la compétition, pas pour le stationnement ou autres usages. 2.  Le bord du plancher doit être protégé, ne pas pouvoir bouger ou tirer. Si dommage, il devrait être réparé à temps. 3.  Les athlètes peuvent porter des chaussures de sport professionnelles pendant la compétition, mais la longueur des pointes ne doit pas dépasser 6 mm. 4.  Il est interdit de porter des talons hauts dans le stade. 5.  Il est strictement interdit de conduire, garer et stocker des marchandises. 6.  Évitez d'introduire des solvants organiques dans le revêtement de sol synthétique, notamment de l'essence, de l'huile, du diesel et des diluants. 7.  Il est interdit d'utiliser tous les produits chimiques, y compris les médicaments traités par les athlètes et les éléments adhésifs tels que les chewing-gums. 8.  En général, le sol synthétique doit rester propre. A haute température, il e...

How to store excess Epoxy paint or rubber paint during construction?

  Epoxy  paint or rubber paint  construction materials are generally not used up at one time during construction. Once the     Epoxy  paint or rubber paint   are  left, we need to store them  to prepare for the next use . The painting , thinners, additives, etc. are all flammable and explosive materials, and they are easy to volatilize and cause harm to the human body and the environment, so we need to do a good job of storage: 1. The   Epoxy  paint or rubber paint   are  stored in a dry, ventilated and low temperature environment, and the temperature cannot be higher than 30 ℃ . 2. The packaging of  paint should be done well, and the opening should be well sealed to avoid contact with air as much as possible. If paint is in contact with air for a long time, it will produce oxidation, which will inevitably affect the effect of next use.