Epoxy paint or rubber paint construction materials are generally not used up at one time during construction. Once the Epoxy paint or rubber paint are left, we need to store them to prepare for the next use.
The painting, thinners, additives, etc. are all flammable and explosive materials, and they are easy to volatilize and cause harm to the human body and the environment, so we need to do a good job of storage:
1. The Epoxy paint or rubber paint are stored in a dry, ventilated and low temperature environment, and the temperature cannot be higher than 30 ℃.
2. The packaging of paint should be done well, and the opening should be well sealed to avoid contact with air as much as possible. If paint is in contact with air for a long time, it will produce oxidation, which will inevitably affect the effect of next use.
Comments
Post a Comment