Design Specification for Stadium Track Drainage System

 Excellent stadium track is a systematic project. High quality rubber surface is attached to the qualified athletic track foundation and perfect drainage system. Only after the completion of the athletic track can it achieve the use effect. So foundation construction is very important for laying athletic track.


1. Sub-base requirement ;Concrete or AC asphalt are available .The compressive strength is more than 3000Psi, with good flatness (Take 2m aluminum magnetic level rule and wedge feeler measure ,the maximum tolerance is no more than 3mm).The drainage slope shall be 003--0.08%.The new concrete surface must maintenance at least 28 natural days.

Foshan GRK Commercial Co ltd is one of the Chinese flooring solution supplier.

2. Precautions for construction of drainage ditch:

1) The structure of the drainage ditch complies with the relevant national "synthetic rubber track construction design standards" (including the size of the ditch body, the size of the cover, the elevation of the ditch bottom, etc.).

2) Settling wells in the drainage ditch at intervals of 20-30m should meet the design requirements.

3) The design of the drainage ditch cover is single-hole or double-hole design. The drainage ditch cover should be installed firmly without swinging. The gaps between each cover should be evenly distributed (about 10mm) and smoothed with cement mortar.

4) The inner wall of the drainage ditch shall be treated with waterproof mortar and ash in strict accordance with the waterproof requirements.

5) The movable manhole covers on the drainage ditch cover (including the sinking manhole cover, the water section door manhole cover, etc.) should be installed firmly and easy to open.

6) The compactness of the foundation backfill of the outer wall of the drainage ditch should reach the standard of more than 95% to prevent the settlement and deformation of the ditch from causing the rubber deformation or cracking between the ditch and the athletic track.

7) If the water supply system is installed in the drainage ditch of the rubber track at the same time, the water supply pipeline should be installed firmly and reliably. In the cold weather area, the water supply pipeline should be insulated and antifreeze treatment.

8) After the construction of the rubber track drainage ditch is completed, the plane error between the drainage ditch cover and the ground foundation on both sides of the ditch shall not be greater than 2mm, and the slope requirements shall be met at the same time without affecting the smooth drainage.

Comments

Popular posts from this blog

what is the standard tennis court size ?

  The "Rules of Tennis Competition" promulgated by the International Tennis Federation and the National Sports Commission stipulate that the area of a standard tennis court shall not be less than 36.6 meters (north-south length) × 18.3 (east-west width) meters = 669.78 m2, which is also a standard tennis court. The net size of the net around the site or the inner wall of the indoor building. Within this area, the standard size of the effective doubles field is: 23.77 meters (length) × 10.98 meters (width) = 260.9 m2, There should be a margin of not less than 6.40 meters behind each end line, and a margin of flow of not less than 3.66 meters beyond each side line. Install net posts on the court, measure the center of the two posts, the distance between the posts is 12.80 meters, and the top of the net post is 0.914 meters from the ground. If it is two or more parallel tennis courts built together. The distance between the sides of adjacent venues is not less than 4.0 meters. ...

Application of SBR granules on rubber track

  The quality of the   SBR granules   will affect the use effect of the Synthetic rubber   track. Therefore, the selection of good SBR granules   is very important for the rubber   track . So what kind of applications are there for the SBR granules   in the running track? What are rubber granules   of synthetic rubber track ? The rubber granules   of the rubber   track are evolved from a kind of reclaimed rubber. Generally speaking, SBR granules   are peeled off from old tires and then processed. In addition, there are colored granules . For example, colored rubber granules , EPDM rubber granules , etc., and different granules   have different functions, some granules   have a beauty effect, and some granules only play an auxiliary role. N ormal ly   , SBR granules   usually present irregular geometric shapes, and such a shape and structure can effectively improve the stability of the overall structure of the ...

Why do many people choose artificial grass instead of natural grass?

  Comparison of artificial turf and natural grass  With the development of society, the cost of using artificial turf is much less than that of natural turf. The key is that it is more convenient to use and more effective. The daily maintenance cost of natural lawns is too high, and some countries and regions cannot afford it due to economic reasons. Natural grass cannot grow under extreme climatic conditions. Natural grass cannot be planted in some covered stadiums. In contrast, artificial turf has the characteristics of high frequency of use, easy paving, simple maintenance, and quick drainage. All these advantages make artificial turf have a broad development space and have a great tendency to replace natural grass.  Safety The surface temperature of artificial turf varies greatly, especially in summer. Studies have found that the maximum temperature can reach 52°C. Such a high temperature will have a great impact on the athlete's competitive state and personal safety...