Design Specification for Stadium Track Drainage System

 Excellent stadium track is a systematic project. High quality rubber surface is attached to the qualified athletic track foundation and perfect drainage system. Only after the completion of the athletic track can it achieve the use effect. So foundation construction is very important for laying athletic track.


1. Sub-base requirement ;Concrete or AC asphalt are available .The compressive strength is more than 3000Psi, with good flatness (Take 2m aluminum magnetic level rule and wedge feeler measure ,the maximum tolerance is no more than 3mm).The drainage slope shall be 003--0.08%.The new concrete surface must maintenance at least 28 natural days.

Foshan GRK Commercial Co ltd is one of the Chinese flooring solution supplier.

2. Precautions for construction of drainage ditch:

1) The structure of the drainage ditch complies with the relevant national "synthetic rubber track construction design standards" (including the size of the ditch body, the size of the cover, the elevation of the ditch bottom, etc.).

2) Settling wells in the drainage ditch at intervals of 20-30m should meet the design requirements.

3) The design of the drainage ditch cover is single-hole or double-hole design. The drainage ditch cover should be installed firmly without swinging. The gaps between each cover should be evenly distributed (about 10mm) and smoothed with cement mortar.

4) The inner wall of the drainage ditch shall be treated with waterproof mortar and ash in strict accordance with the waterproof requirements.

5) The movable manhole covers on the drainage ditch cover (including the sinking manhole cover, the water section door manhole cover, etc.) should be installed firmly and easy to open.

6) The compactness of the foundation backfill of the outer wall of the drainage ditch should reach the standard of more than 95% to prevent the settlement and deformation of the ditch from causing the rubber deformation or cracking between the ditch and the athletic track.

7) If the water supply system is installed in the drainage ditch of the rubber track at the same time, the water supply pipeline should be installed firmly and reliably. In the cold weather area, the water supply pipeline should be insulated and antifreeze treatment.

8) After the construction of the rubber track drainage ditch is completed, the plane error between the drainage ditch cover and the ground foundation on both sides of the ditch shall not be greater than 2mm, and the slope requirements shall be met at the same time without affecting the smooth drainage.

Comments

Popular posts from this blog

Synthetic Sports Flooring Used Instruction

  1.  Synthetic Sports flooring  only for teaching, training and competition, not for parking or others usage 2.  The flooring edge should be protected, not allow to move or pull. If damage, it should be repaired in time. 3.  Athletes can wear professional sports shoes during the competition, but the length of the spikes should not exceed 6mm. 4.  It is forbidden to wear high heels into the stadium. 5.  It is strictly forbidden to drive, park and stock goods. 6.  Avoid put the organic solvents in the synthetic flooring, including gasoline, oil, diesel and thinner. 7.  It is forbidden to use all chemicals, including athlete-treated drugs and adhesive items such as chewing gum. 8.  In general, the synthetic flooring should be kept clean. In high temperature, it is recommended to use water to cool down to improve the service life. 9.  When the synthetic sports flooring is oily, it can be cleaned with natural detergent, etc., avoid usin...

Cement embossed floor

Suelos deportivos sintéticos utilizados Instrucción

  1.  Pavimento deportivo sintético  solo para enseñanza, entrenamiento y competición, no para estacionamiento u otros usos 2.   El borde del piso debe estar protegido, no debe moverse ni tirar. Si el daño, debe ser reparado a tiempo. 3.  Los atletas pueden usar calzado deportivo profesional durante la competencia, pero la longitud de los picos no debe exceder los 6 mm. 4.  Está prohibido llevar tacones altos en el estadio. 5.  Está estrictamente prohibido conducir, estacionar y almacenar mercancías. 6.  Evite colocar los solventes orgánicos en el piso sintético, incluyendo gasolina, aceite, diesel y diluyente. 7.  Está prohibido usar todos los productos químicos, incluidos los medicamentos tratados con atletas y elementos adhesivos como el chicle. 8.  En general, el suelo sintético debe mantenerse limpio. En temperaturas altas, se recomienda usar agua para enfriarse para mejorar la vida útil. 9.  Cuando el piso sintético para ...