The problems encountered during the construction of the rubber track and the treatment measures

 The problems encountered during the construction of the rubber track and the treatment measures

rubber bulging, delamination from the foundation

After the rubber track is finished, local or large-area bulging occurs in a short period of time, or it is separated from the foundation.

Cause Analysis:

If the cement label is unqualified or the basic water and gas barrier is unqualified, the ground water vapor rises and lifts the plastic layer, causing the plastic layer to bulge.

Treatment measures:

Cut off the bubbling part, dry the foundation and do a waterproofing treatment, then fill it up as required, and then fill in the color difference.

Precaution:

Strictly control the quality of basic waterproofing. When laying PU plastic, the basic moisture content and air humidity should be within a safe range.

Foshan GRK Commercial co ltd is focused on PU rubber track on stadium in China ,we are directly manufacture ,we are not only offer materials but also application service.

www.outdoorpaintfloor.com

www.fsgrk.com

WhatsApp:008613660776067

Email:grk-wendy@foshangrk.com.cn

 

Not cured, the surface is sticky

Cause Analysis:

1. During construction, the material ratio error exceeds the safe range, causing the component ratio to be imbalanced, resulting in no cross-linking reaction of the material, which makes the material too viscous or even weak.

2. No hardener is added, or the amount of hardener is too small or the hardener is invalid. These three aspects will cause the material to not be able to fully react and affect the strength of the material.

3. The diluent used is unqualified and contains other impurities, such as alcohols, water, etc., which will hinder the molecular chain when the plastic material reacts, fail to form a polymer, or cause a proportional imbalance.

Treatment measures:

According to the practical situation, decide whether to eradicate and resurface the wet part.

Precaution:

1. Check weighing scales and scales before construction to ensure that their accuracy meets the requirements;

2. Operate strictly in accordance with the construction technical requirements. A small test must be done before construction to determine the quality of the thinner, the quality or the amount of the hardener to avoid unnecessary losses.

Comments

Popular posts from this blog

Synthetic Sports Flooring Used Instruction

  1.  Synthetic Sports flooring  only for teaching, training and competition, not for parking or others usage 2.  The flooring edge should be protected, not allow to move or pull. If damage, it should be repaired in time. 3.  Athletes can wear professional sports shoes during the competition, but the length of the spikes should not exceed 6mm. 4.  It is forbidden to wear high heels into the stadium. 5.  It is strictly forbidden to drive, park and stock goods. 6.  Avoid put the organic solvents in the synthetic flooring, including gasoline, oil, diesel and thinner. 7.  It is forbidden to use all chemicals, including athlete-treated drugs and adhesive items such as chewing gum. 8.  In general, the synthetic flooring should be kept clean. In high temperature, it is recommended to use water to cool down to improve the service life. 9.  When the synthetic sports flooring is oily, it can be cleaned with natural detergent, etc., avoid usin...

Plancher de sport synthétique utilisé Instruction

  1.  Sols sportifs synthétiques  uniquement pour l'enseignement, l'entraînement et la compétition, pas pour le stationnement ou autres usages. 2.  Le bord du plancher doit être protégé, ne pas pouvoir bouger ou tirer. Si dommage, il devrait être réparé à temps. 3.  Les athlètes peuvent porter des chaussures de sport professionnelles pendant la compétition, mais la longueur des pointes ne doit pas dépasser 6 mm. 4.  Il est interdit de porter des talons hauts dans le stade. 5.  Il est strictement interdit de conduire, garer et stocker des marchandises. 6.  Évitez d'introduire des solvants organiques dans le revêtement de sol synthétique, notamment de l'essence, de l'huile, du diesel et des diluants. 7.  Il est interdit d'utiliser tous les produits chimiques, y compris les médicaments traités par les athlètes et les éléments adhésifs tels que les chewing-gums. 8.  En général, le sol synthétique doit rester propre. A haute température, il e...

Dimensiones de la cancha de bádminton

  Las dimensiones de un tribunal  de bádminton  son mandatos de la Federación Mundial de Bádminton (BWF) y son universalmente aceptados. Las medidas no han cambiado desde que se establecieron en 1934. El  bádminton  se juega típicamente en pisos del hardwood o las esteras de goma sintéticas hechas específicamente para el bádminton. El tribunal mide 44 pies de largo y 20 pies de ancho y se divide por una red en dos mitades idénticas. La corte estándar contiene líneas para los individuales y dobles jugar. Doublesplay es designado por las líneas exteriores, mientras que los singles utilizan la línea de base y la línea lateral. La cancha de dobles tiene la misma longitud que la cancha de individuales, pero la línea lateral exterior la hace 18 pulgadas más ancha.   Badminton Court Lines Todas las líneas están normalizadas para ser de 1,57 pulgadas de ancho. Esta medida es esencial porque las líneas se consideran parte de la pista. Si el volante toca cualquier pa...