The problems encountered during the construction of the rubber track and the treatment measures

 The problems encountered during the construction of the rubber track and the treatment measures

rubber bulging, delamination from the foundation

After the rubber track is finished, local or large-area bulging occurs in a short period of time, or it is separated from the foundation.

Cause Analysis:

If the cement label is unqualified or the basic water and gas barrier is unqualified, the ground water vapor rises and lifts the plastic layer, causing the plastic layer to bulge.

Treatment measures:

Cut off the bubbling part, dry the foundation and do a waterproofing treatment, then fill it up as required, and then fill in the color difference.

Precaution:

Strictly control the quality of basic waterproofing. When laying PU plastic, the basic moisture content and air humidity should be within a safe range.

Foshan GRK Commercial co ltd is focused on PU rubber track on stadium in China ,we are directly manufacture ,we are not only offer materials but also application service.

www.outdoorpaintfloor.com

www.fsgrk.com

WhatsApp:008613660776067

Email:grk-wendy@foshangrk.com.cn

 

Not cured, the surface is sticky

Cause Analysis:

1. During construction, the material ratio error exceeds the safe range, causing the component ratio to be imbalanced, resulting in no cross-linking reaction of the material, which makes the material too viscous or even weak.

2. No hardener is added, or the amount of hardener is too small or the hardener is invalid. These three aspects will cause the material to not be able to fully react and affect the strength of the material.

3. The diluent used is unqualified and contains other impurities, such as alcohols, water, etc., which will hinder the molecular chain when the plastic material reacts, fail to form a polymer, or cause a proportional imbalance.

Treatment measures:

According to the practical situation, decide whether to eradicate and resurface the wet part.

Precaution:

1. Check weighing scales and scales before construction to ensure that their accuracy meets the requirements;

2. Operate strictly in accordance with the construction technical requirements. A small test must be done before construction to determine the quality of the thinner, the quality or the amount of the hardener to avoid unnecessary losses.

Comments

Popular posts from this blog

Application of SBR granules on rubber track

  The quality of the   SBR granules   will affect the use effect of the Synthetic rubber   track. Therefore, the selection of good SBR granules   is very important for the rubber   track . So what kind of applications are there for the SBR granules   in the running track? What are rubber granules   of synthetic rubber track ? The rubber granules   of the rubber   track are evolved from a kind of reclaimed rubber. Generally speaking, SBR granules   are peeled off from old tires and then processed. In addition, there are colored granules . For example, colored rubber granules , EPDM rubber granules , etc., and different granules   have different functions, some granules   have a beauty effect, and some granules only play an auxiliary role. N ormal ly   , SBR granules   usually present irregular geometric shapes, and such a shape and structure can effectively improve the stability of the overall structure of the ...

what is the standard tennis court size ?

  The "Rules of Tennis Competition" promulgated by the International Tennis Federation and the National Sports Commission stipulate that the area of a standard tennis court shall not be less than 36.6 meters (north-south length) × 18.3 (east-west width) meters = 669.78 m2, which is also a standard tennis court. The net size of the net around the site or the inner wall of the indoor building. Within this area, the standard size of the effective doubles field is: 23.77 meters (length) × 10.98 meters (width) = 260.9 m2, There should be a margin of not less than 6.40 meters behind each end line, and a margin of flow of not less than 3.66 meters beyond each side line. Install net posts on the court, measure the center of the two posts, the distance between the posts is 12.80 meters, and the top of the net post is 0.914 meters from the ground. If it is two or more parallel tennis courts built together. The distance between the sides of adjacent venues is not less than 4.0 meters. ...

During Atheltic rubber track construction,how to avoid rain ?

  I believe that many constrution teams  meet this problem.Just after the construction of tartan track ,it was drenched and even soaked by the sudden heavy rain.Apart from worrying, there was no remedy. According to years of experience, there are two ways to deal with rubber track that are drenched by rainwater. 1.  The rubber  track cannot be completely cured after being exposed to rain. This kind of treatment is more troublesome. The incurable  part must be completely shoveled off, and then thoroughly polished until the underground cement foundation is exposed, and then restart according to the process. Although it is a waste of materials and labor, this is the only more thorough solution without any sequelae. 2.  The   athletic running tartan t rack can be cured after being exposed to rain, but there are many small pits on the surface that are smashed by raindrops, and there may be bubbles in some places. To deal with this situation, first use a kn...