Types of sports stadium structures and construction arrangements between processes

 Types of sports stadium structures and construction arrangements between processes



There are many special competitions in the construction and construction of the sports stadium venues. Each special competition has its own competition rules. At the same time, there are some special competition structures, such as the jumping board and sand pit for the long jump competition, the hole in the pole vault competition, and the track competition. Obstacle pool and inner ring drainage ditch for mid-3000m run. Most of these structures are reinforced concrete structures, and the position and size requirements of the structures are within millimeters (mm). During construction, they are constructed as general civil engineering structures.

FOSHAN GRK COMMERCIAL CO LTD

www.fsgrk.com  / www.outdoorpaintfloor.com

WhatsApp: 008613660776067

Email: grk-wendy@foshangrk.com.cn

Once the error is too large, it will cause trouble to the recognition of the competition results. Otherwise, it will have to be dismantled and reworked. There have been cases where the 3000m obstacle course was completely dismantled due to its misalignment with the runway, and the long jump jumping board was not perpendicular to the runway and was removed. Therefore, in the construction of track and field venues, the construction of structures cannot be ignored from the beginning of the line. Every process must be strictly checked until the process of pouring cement concrete. The structures of the track and field include: long jump and triple jump take-off boards, sand pits, shot throwing rings and throwing areas, hammer throwing discus throwing rings and throwing areas, pole vaulting holes, and the construction of inner ring drainage ditch.

The construction sequence of various professional structures is also very important. It is different from general civil engineering because the structure is small in size and requires many processes, location and elevation requirements are high, and the construction area is large, which often affects other process operations, which will affect the entire construction period of the site. Unwanted extension. For example, because of unreasonable arrangements for the construction of the stadium of a sports school in Beijing, the entire construction period lasted about eight months, while the entire construction period of the sports stadium under the same conditions was completed in four months.

Comments

Popular posts from this blog

Synthetic Sports Flooring Used Instruction

  1.  Synthetic Sports flooring  only for teaching, training and competition, not for parking or others usage 2.  The flooring edge should be protected, not allow to move or pull. If damage, it should be repaired in time. 3.  Athletes can wear professional sports shoes during the competition, but the length of the spikes should not exceed 6mm. 4.  It is forbidden to wear high heels into the stadium. 5.  It is strictly forbidden to drive, park and stock goods. 6.  Avoid put the organic solvents in the synthetic flooring, including gasoline, oil, diesel and thinner. 7.  It is forbidden to use all chemicals, including athlete-treated drugs and adhesive items such as chewing gum. 8.  In general, the synthetic flooring should be kept clean. In high temperature, it is recommended to use water to cool down to improve the service life. 9.  When the synthetic sports flooring is oily, it can be cleaned with natural detergent, etc., avoid usin...

what is the standard tennis court size ?

  The "Rules of Tennis Competition" promulgated by the International Tennis Federation and the National Sports Commission stipulate that the area of a standard tennis court shall not be less than 36.6 meters (north-south length) × 18.3 (east-west width) meters = 669.78 m2, which is also a standard tennis court. The net size of the net around the site or the inner wall of the indoor building. Within this area, the standard size of the effective doubles field is: 23.77 meters (length) × 10.98 meters (width) = 260.9 m2, There should be a margin of not less than 6.40 meters behind each end line, and a margin of flow of not less than 3.66 meters beyond each side line. Install net posts on the court, measure the center of the two posts, the distance between the posts is 12.80 meters, and the top of the net post is 0.914 meters from the ground. If it is two or more parallel tennis courts built together. The distance between the sides of adjacent venues is not less than 4.0 meters. ...

Why do many people choose artificial grass instead of natural grass?

  Comparison of artificial turf and natural grass  With the development of society, the cost of using artificial turf is much less than that of natural turf. The key is that it is more convenient to use and more effective. The daily maintenance cost of natural lawns is too high, and some countries and regions cannot afford it due to economic reasons. Natural grass cannot grow under extreme climatic conditions. Natural grass cannot be planted in some covered stadiums. In contrast, artificial turf has the characteristics of high frequency of use, easy paving, simple maintenance, and quick drainage. All these advantages make artificial turf have a broad development space and have a great tendency to replace natural grass.  Safety The surface temperature of artificial turf varies greatly, especially in summer. Studies have found that the maximum temperature can reach 52°C. Such a high temperature will have a great impact on the athlete's competitive state and personal safety...