Skip to main content

Types of sports stadium structures and construction arrangements between processes

 Types of sports stadium structures and construction arrangements between processes



There are many special competitions in the construction and construction of the sports stadium venues. Each special competition has its own competition rules. At the same time, there are some special competition structures, such as the jumping board and sand pit for the long jump competition, the hole in the pole vault competition, and the track competition. Obstacle pool and inner ring drainage ditch for mid-3000m run. Most of these structures are reinforced concrete structures, and the position and size requirements of the structures are within millimeters (mm). During construction, they are constructed as general civil engineering structures.

FOSHAN GRK COMMERCIAL CO LTD

www.fsgrk.com  / www.outdoorpaintfloor.com

WhatsApp: 008613660776067

Email: grk-wendy@foshangrk.com.cn

Once the error is too large, it will cause trouble to the recognition of the competition results. Otherwise, it will have to be dismantled and reworked. There have been cases where the 3000m obstacle course was completely dismantled due to its misalignment with the runway, and the long jump jumping board was not perpendicular to the runway and was removed. Therefore, in the construction of track and field venues, the construction of structures cannot be ignored from the beginning of the line. Every process must be strictly checked until the process of pouring cement concrete. The structures of the track and field include: long jump and triple jump take-off boards, sand pits, shot throwing rings and throwing areas, hammer throwing discus throwing rings and throwing areas, pole vaulting holes, and the construction of inner ring drainage ditch.

The construction sequence of various professional structures is also very important. It is different from general civil engineering because the structure is small in size and requires many processes, location and elevation requirements are high, and the construction area is large, which often affects other process operations, which will affect the entire construction period of the site. Unwanted extension. For example, because of unreasonable arrangements for the construction of the stadium of a sports school in Beijing, the entire construction period lasted about eight months, while the entire construction period of the sports stadium under the same conditions was completed in four months.

Comments

Popular posts from this blog

Application of SBR granules on rubber track

  The quality of the   SBR granules   will affect the use effect of the Synthetic rubber   track. Therefore, the selection of good SBR granules   is very important for the rubber   track . So what kind of applications are there for the SBR granules   in the running track? What are rubber granules   of synthetic rubber track ? The rubber granules   of the rubber   track are evolved from a kind of reclaimed rubber. Generally speaking, SBR granules   are peeled off from old tires and then processed. In addition, there are colored granules . For example, colored rubber granules , EPDM rubber granules , etc., and different granules   have different functions, some granules   have a beauty effect, and some granules only play an auxiliary role. N ormal ly   , SBR granules   usually present irregular geometric shapes, and such a shape and structure can effectively improve the stability of the overall structure of the ...

what is the standard tennis court size ?

  The "Rules of Tennis Competition" promulgated by the International Tennis Federation and the National Sports Commission stipulate that the area of a standard tennis court shall not be less than 36.6 meters (north-south length) × 18.3 (east-west width) meters = 669.78 m2, which is also a standard tennis court. The net size of the net around the site or the inner wall of the indoor building. Within this area, the standard size of the effective doubles field is: 23.77 meters (length) × 10.98 meters (width) = 260.9 m2, There should be a margin of not less than 6.40 meters behind each end line, and a margin of flow of not less than 3.66 meters beyond each side line. Install net posts on the court, measure the center of the two posts, the distance between the posts is 12.80 meters, and the top of the net post is 0.914 meters from the ground. If it is two or more parallel tennis courts built together. The distance between the sides of adjacent venues is not less than 4.0 meters. ...

During Atheltic rubber track construction,how to avoid rain ?

  I believe that many constrution teams  meet this problem.Just after the construction of tartan track ,it was drenched and even soaked by the sudden heavy rain.Apart from worrying, there was no remedy. According to years of experience, there are two ways to deal with rubber track that are drenched by rainwater. 1.  The rubber  track cannot be completely cured after being exposed to rain. This kind of treatment is more troublesome. The incurable  part must be completely shoveled off, and then thoroughly polished until the underground cement foundation is exposed, and then restart according to the process. Although it is a waste of materials and labor, this is the only more thorough solution without any sequelae. 2.  The   athletic running tartan t rack can be cured after being exposed to rain, but there are many small pits on the surface that are smashed by raindrops, and there may be bubbles in some places. To deal with this situation, first use a kn...