Skip to main content

Types of sports stadium structures and construction arrangements between processes

 Types of sports stadium structures and construction arrangements between processes



There are many special competitions in the construction and construction of the sports stadium venues. Each special competition has its own competition rules. At the same time, there are some special competition structures, such as the jumping board and sand pit for the long jump competition, the hole in the pole vault competition, and the track competition. Obstacle pool and inner ring drainage ditch for mid-3000m run. Most of these structures are reinforced concrete structures, and the position and size requirements of the structures are within millimeters (mm). During construction, they are constructed as general civil engineering structures.

FOSHAN GRK COMMERCIAL CO LTD

www.fsgrk.com  / www.outdoorpaintfloor.com

WhatsApp: 008613660776067

Email: grk-wendy@foshangrk.com.cn

Once the error is too large, it will cause trouble to the recognition of the competition results. Otherwise, it will have to be dismantled and reworked. There have been cases where the 3000m obstacle course was completely dismantled due to its misalignment with the runway, and the long jump jumping board was not perpendicular to the runway and was removed. Therefore, in the construction of track and field venues, the construction of structures cannot be ignored from the beginning of the line. Every process must be strictly checked until the process of pouring cement concrete. The structures of the track and field include: long jump and triple jump take-off boards, sand pits, shot throwing rings and throwing areas, hammer throwing discus throwing rings and throwing areas, pole vaulting holes, and the construction of inner ring drainage ditch.

The construction sequence of various professional structures is also very important. It is different from general civil engineering because the structure is small in size and requires many processes, location and elevation requirements are high, and the construction area is large, which often affects other process operations, which will affect the entire construction period of the site. Unwanted extension. For example, because of unreasonable arrangements for the construction of the stadium of a sports school in Beijing, the entire construction period lasted about eight months, while the entire construction period of the sports stadium under the same conditions was completed in four months.

Comments

Popular posts from this blog

Cement embossed floor

Synthetic Sports Flooring Used Instruction

  1.  Synthetic Sports flooring  only for teaching, training and competition, not for parking or others usage 2.  The flooring edge should be protected, not allow to move or pull. If damage, it should be repaired in time. 3.  Athletes can wear professional sports shoes during the competition, but the length of the spikes should not exceed 6mm. 4.  It is forbidden to wear high heels into the stadium. 5.  It is strictly forbidden to drive, park and stock goods. 6.  Avoid put the organic solvents in the synthetic flooring, including gasoline, oil, diesel and thinner. 7.  It is forbidden to use all chemicals, including athlete-treated drugs and adhesive items such as chewing gum. 8.  In general, the synthetic flooring should be kept clean. In high temperature, it is recommended to use water to cool down to improve the service life. 9.  When the synthetic sports flooring is oily, it can be cleaned with natural detergent, etc., avoid usin...

Stadium standard design plan

  With the continuous development of society, rubber stadium are also entering people’s lives more and more. They are not only a gathering place for a variety of sports, but also a venue for many large-scale events. Let’s look at the optimal plan design for sports. FOSHAN GRK COMMERCIAL CO LTD Contact:Wendy email:grk-wendy@foshangrk.com.cn (1)  Competition items: The IAAF Track and Field Facilities Standard Manual stipulates the standard sports track inner circle circumference is 400 meters, of which the radius of the curve should be 36.5 meters, and the straight road should be along the north-south direction to avoid the dazzling influence when the sun position is low. The curve should have 8 lanes, each lane is 1.22 meters wide, and the straight road has 8 to 10 lanes. The safety area inside and outside the track shall be no less than 1 meter. It is necessary to mark the end position of the competition, mark the position of the obstacle course pool, and mark the intersecti...