Spray Coat track introduction

Spray coat track is one kind of economic,easy installation,stable quality and environmentally friendly running rubber track.It is widely adopted by customers.It is generally used in China as high as 60% .How much do you know about spray coat track? Today let’s make a detailed explanation for you.



Spray coat track structure by PU binder as primer,rubber granules(SBR granules or EPDM granules)mixed with binder as the bottom layer,the top coat is by spray EPDM granules with PU materials.The standard thickness is 11-15mm ,normally the color is red, green or blue.Red color is more popular due to the UV resistant.

Compared with others style rubber track(sandwich track,full PU track,perfabric track,EPDM track),spray coat track is the most economic rubber track,both suitable for indoor and outdoor ,concrete subbase and asphalt. It is very easy to install, the weather requirement is not too high ,after rain,only requested the surface dry ,then it can install again,no need to wait till the whole floor total dry. It dont have bubble during application.

Due to the structure,it belong to permeable track, the finished track surface have hole ,it can permeate water by itself.After rain,spray coat track have good drainage systemthe surface, it dont have waterponding.Athletic can run immediately after rain,the use efficiency is improved,the lifespan more than 5years,it has strong weather resistance and is suitable for all weather used. It recomend to the non-standard stadium,school, training center.



The performance characteristics of Spray coat track

1. Strong UV resistance

2. It has a strong elastic layer which can effectively avoid sports injuries and is not easy to be scratched by the sole and other hard objects

3. Wearing resistance and aging resistance,to meet the requirements of long-term high frequency use

4. Excellent weather resistance,light resistance,and water resistance which can improve the efficiency of use

5. The color is durable,does not easy to fade.

6. Strong strain resistance,easy to clean and maintain.

Spray coat installation method:

1) Clean the subase

2) Brush the binder

3) Apply the Rubber layer, 8kg SBR granules mix with 1kg binder,and apply by paver mahicne.It takes 8hours to dry.

Remark: Step 1,2,and 3 are carried out at the same time ;if profossion flooring engineer builder,it suggest to buy a professional 2.5paver machine. If you are the various engineering builder,in order to save the cost,buy a electric paver machine .

4) After 8hours,it begin to spray the top coat, Mixed EPDM granules,PU group A,PU group B,hardener and resin ,then spray by machine. It suggest to spray it clockwise and spray it counterclockwise total twice spray. It takes 8 hours to dry.

5) Line marking ,measure the size,positioning,and marking the line.

Article source by FOSHAN GRK COMMERCIAL CO LTD, www.outdoorpaintfloor.com  or www.fsgrk.com

Installation video : https://www.youtube.com/watch?v=qYxF12GzoKI&list=PLc64pHUDdGnPuvq57AhYkGxuDgevM19Yi&index=7

Comments

Popular posts from this blog

Standard Basketball Court Size

  1. The playing   basketball court is 28 meters long and 15 meters wide. The ratio of long money: 28:15. The area of the competition area is 28*15=420 m2. 2. Line: The width is 0.05 meters (5 cm).     Boundary: The court boundary is at least 2 meters away from spectators, billboards or any other obstacles. The boundary on the long side of the court is called the sideline, and the boundary on the short side is called the endline. 3. Free throw line, restricted area and penalty area: the area of the three-second zone = (3.6+6)*5.8/2=27.84m2 1. The free throw line should be parallel to the end line, and its outer edge is 5.80 meters away from the inner edge of the end line; this line is 3.60 meters long. Its midpoint must fall on the imaginary line connecting the midpoints of the two end lines. 2. The ground area formed by drawing two lines from both ends of the free throw line to 3 meters from the midpoint of the end line (both measured from the outer edge)...

what is the standard tennis court size ?

  The "Rules of Tennis Competition" promulgated by the International Tennis Federation and the National Sports Commission stipulate that the area of a standard tennis court shall not be less than 36.6 meters (north-south length) × 18.3 (east-west width) meters = 669.78 m2, which is also a standard tennis court. The net size of the net around the site or the inner wall of the indoor building. Within this area, the standard size of the effective doubles field is: 23.77 meters (length) × 10.98 meters (width) = 260.9 m2, There should be a margin of not less than 6.40 meters behind each end line, and a margin of flow of not less than 3.66 meters beyond each side line. Install net posts on the court, measure the center of the two posts, the distance between the posts is 12.80 meters, and the top of the net post is 0.914 meters from the ground. If it is two or more parallel tennis courts built together. The distance between the sides of adjacent venues is not less than 4.0 meters. ...

Why does PVC floor warp?

  Many consumers may experience warping when using PVC flooring. When the cardboard is warped, consumers can determine that this is a flooring quality problem, and exactly what causes the PVC flooring to warp. 1. because the poor quality, it will cause warpage problems. The structural stability of PVC floor is poor, and it is easy to shrink or expand at the alternating temperature of cold and heat, so it is easy to warp. The PVC floor production standard of the regular manufacturer, the floor quality is guaranteed, durable, and can reduce the chance of warping. 2. Architectural attachments can also lead to floor edges. PVC floor surfacing accessories are often used in latex, double-sided tape and pit knife glue. High-quality glue can make the floor and the ground stick together, and it is also very waterproof. If the glue is not good, it is easy to cause the floor to be weak and easy to bend. Of course, construction quality should not be ignored. Specialized construction personnel ...