How to distribute the drainage of the rubber track?

 The synthetic running track of the stadium has a large area, and the rainwater from the surrounding auditorium also flows into the venue. The venue must be used as soon as possible after the rain. The IAAF stipulates: "When the track and field ground is completely submerged, drain water for 20 minutes. Here The water depth of the ground area at any location shall not exceed the depth of the ground structure of the track and field".



Site drainage can be a combination of surface runoff drainage and underground infiltration. If only ground runoff is used for drainage, the site is required to be flat and the flooding slope is very uniform, which is difficult for large-area football fields and field games. It is impossible to discharge by water seepage alone, because the water seepage capacity of the site is related to the site structure itself. Even if the water seepage is good, its water seepage capacity will become worse and worse as the service life increases. In addition, the water seepage capacity of the turf football field should not be too strong, because too much water and fertilizer loss will cause poor turf growth. A more appropriate drainage method is that the seepage rate is lower than the surface runoff rate. Therefore, the method of "draining percolation combined with drainage as the main" method is generally adopted.

Divide the entire stadium rubber tartan track into three drainage areas

1. The drainage area drains the rainwater above the stands, and mainly takes the surface runoff method to drain the surface water into the drainage ditch.

2. The drainage area is the race track itself and the semicircle field at the north and south ends. There are two drainage methods in this area. When the athletic track is a slag athletic track, the drainage can be "drained and combined"; when the athletic track is a rubber tartan track, runoff drainage must be used to drain ground water into the inner side of the athletic track. Drainage ditch (see the "site structure" section for construction practices).

3. The drainage area is the area within the racetrack and the field, including the football field and its buffer zone. Generally, the method of "drainage and seepage combined" is adopted. 

Comments

Popular posts from this blog

Synthetic Sports Flooring Used Instruction

  1.  Synthetic Sports flooring  only for teaching, training and competition, not for parking or others usage 2.  The flooring edge should be protected, not allow to move or pull. If damage, it should be repaired in time. 3.  Athletes can wear professional sports shoes during the competition, but the length of the spikes should not exceed 6mm. 4.  It is forbidden to wear high heels into the stadium. 5.  It is strictly forbidden to drive, park and stock goods. 6.  Avoid put the organic solvents in the synthetic flooring, including gasoline, oil, diesel and thinner. 7.  It is forbidden to use all chemicals, including athlete-treated drugs and adhesive items such as chewing gum. 8.  In general, the synthetic flooring should be kept clean. In high temperature, it is recommended to use water to cool down to improve the service life. 9.  When the synthetic sports flooring is oily, it can be cleaned with natural detergent, etc., avoid usin...

Plancher de sport synthétique utilisé Instruction

  1.  Sols sportifs synthétiques  uniquement pour l'enseignement, l'entraînement et la compétition, pas pour le stationnement ou autres usages. 2.  Le bord du plancher doit être protégé, ne pas pouvoir bouger ou tirer. Si dommage, il devrait être réparé à temps. 3.  Les athlètes peuvent porter des chaussures de sport professionnelles pendant la compétition, mais la longueur des pointes ne doit pas dépasser 6 mm. 4.  Il est interdit de porter des talons hauts dans le stade. 5.  Il est strictement interdit de conduire, garer et stocker des marchandises. 6.  Évitez d'introduire des solvants organiques dans le revêtement de sol synthétique, notamment de l'essence, de l'huile, du diesel et des diluants. 7.  Il est interdit d'utiliser tous les produits chimiques, y compris les médicaments traités par les athlètes et les éléments adhésifs tels que les chewing-gums. 8.  En général, le sol synthétique doit rester propre. A haute température, il e...

Dimensiones de la cancha de bádminton

  Las dimensiones de un tribunal  de bádminton  son mandatos de la Federación Mundial de Bádminton (BWF) y son universalmente aceptados. Las medidas no han cambiado desde que se establecieron en 1934. El  bádminton  se juega típicamente en pisos del hardwood o las esteras de goma sintéticas hechas específicamente para el bádminton. El tribunal mide 44 pies de largo y 20 pies de ancho y se divide por una red en dos mitades idénticas. La corte estándar contiene líneas para los individuales y dobles jugar. Doublesplay es designado por las líneas exteriores, mientras que los singles utilizan la línea de base y la línea lateral. La cancha de dobles tiene la misma longitud que la cancha de individuales, pero la línea lateral exterior la hace 18 pulgadas más ancha.   Badminton Court Lines Todas las líneas están normalizadas para ser de 1,57 pulgadas de ancho. Esta medida es esencial porque las líneas se consideran parte de la pista. Si el volante toca cualquier pa...