How to distribute the drainage of the rubber track?

 The synthetic running track of the stadium has a large area, and the rainwater from the surrounding auditorium also flows into the venue. The venue must be used as soon as possible after the rain. The IAAF stipulates: "When the track and field ground is completely submerged, drain water for 20 minutes. Here The water depth of the ground area at any location shall not exceed the depth of the ground structure of the track and field".



Site drainage can be a combination of surface runoff drainage and underground infiltration. If only ground runoff is used for drainage, the site is required to be flat and the flooding slope is very uniform, which is difficult for large-area football fields and field games. It is impossible to discharge by water seepage alone, because the water seepage capacity of the site is related to the site structure itself. Even if the water seepage is good, its water seepage capacity will become worse and worse as the service life increases. In addition, the water seepage capacity of the turf football field should not be too strong, because too much water and fertilizer loss will cause poor turf growth. A more appropriate drainage method is that the seepage rate is lower than the surface runoff rate. Therefore, the method of "draining percolation combined with drainage as the main" method is generally adopted.

Divide the entire stadium rubber tartan track into three drainage areas

1. The drainage area drains the rainwater above the stands, and mainly takes the surface runoff method to drain the surface water into the drainage ditch.

2. The drainage area is the race track itself and the semicircle field at the north and south ends. There are two drainage methods in this area. When the athletic track is a slag athletic track, the drainage can be "drained and combined"; when the athletic track is a rubber tartan track, runoff drainage must be used to drain ground water into the inner side of the athletic track. Drainage ditch (see the "site structure" section for construction practices).

3. The drainage area is the area within the racetrack and the field, including the football field and its buffer zone. Generally, the method of "drainage and seepage combined" is adopted. 

Comments

Popular posts from this blog

Daily maintenance and maintenance of the squash court

  Daily maintenance and maintenance of the squash court : Foshan GRK Commercial Co ltd is one of the Chinese sports and commercial flooring supplier. The squash court is an international standard competition venue with a standard width of 6.4 meters, a length of 9.75 meters, a front height of 4.57 meters, a back height of 2.13 meters, a ceiling height of 5-6 meters, a castanets height of 0.48 meters, and a frontal serve line height of 1.83 meters. System: 6mm thick American SPORTWALL elastic swing system, floor system: 18mm thick maple floor, glass back wall system: 12mm thick tempered glass and hardware accessories. So what kind of daily maintenance and maintenance are needed for the squash court : 1. Equipped with professional sports shoes, and put them outside the designated squash court. It is best to equip a few more pairs. There should be carpets or dust-removing mats under your feet. You can't wear shoes directly into the arena from outside, like Leather shoes and rubber sh

Stadium standard design plan

  With the continuous development of society, rubber stadium are also entering people’s lives more and more. They are not only a gathering place for a variety of sports, but also a venue for many large-scale events. Let’s look at the optimal plan design for sports. FOSHAN GRK COMMERCIAL CO LTD Contact:Wendy email:grk-wendy@foshangrk.com.cn (1)  Competition items: The IAAF Track and Field Facilities Standard Manual stipulates the standard sports track inner circle circumference is 400 meters, of which the radius of the curve should be 36.5 meters, and the straight road should be along the north-south direction to avoid the dazzling influence when the sun position is low. The curve should have 8 lanes, each lane is 1.22 meters wide, and the straight road has 8 to 10 lanes. The safety area inside and outside the track shall be no less than 1 meter. It is necessary to mark the end position of the competition, mark the position of the obstacle course pool, and mark the intersection of the

Why EPDM granules are the first choice for kindergarten rubber flooring?

  Why do you need to add EPDM granules to the kindergarten rubber flooring? Everyone may be puzzled. In fact, it is beneficial to say that EPDM granules are added to the kindergarten rubber flooring . Why do you say that? Please come and learn about it! EPDM granules are produced from synthetic rubber, which can produce a variety of colors and are resistant to ultraviolet radiation and general chemical reactions with their excellent performance. Used in the kindergarten rubber flooring material, it can increase its flexibility and prolong its life. Especially when there are patterns in the construction, the superiority of EPDM colored granules can be more apparent. Advantages of kindergarten rubber flooring EPDM : 1.  The product can be customized according to user requirements. The color, size, and rubber content of the granules can be customized to meet the different needs of users. 2. Chemical stability Our products have high corrosion resistance and excellent chemical stability,